Design / Build
The Design / Build approach offers an alternative to the traditional method of Design-Bid-Build. With Design / Build, the Contractor and Architect and Engineer work cooperatively to serve the project Owner. The Owner, Contractor, and Architect / Engineer work as a TEAM to Design and Build a project that meets the Owner's expectations.
Cost control on a project is most readily achieved early in the design process. With Design / Build a project cost is established early in the process as soon as preliminary drawings are ready.
Through positive interaction and a focus on solutions, the construction process is more efficient and productive. Delivery time of a completed project is generally shorter using Design / Build
|
Advantages of Design / Build Construction
|
|
1.
|
You receive early cost input from the contractor. A price is put on conceptual design ideas as they are developed. Maximum cost savings are achieved this way.
|
|
2.
|
Time can be saved because construction can begin before the design is completed. Example: Architect could be completing interior design while the site and foundation work is underway. This technique is called FAST TRACKING (see graph below)
|
|
3.
|
Change orders are eliminated unless owner adds to the scope of work or the property has unforeseen site problems.
|
|
4.
|
Architectural and engineering fees are kept to a minimum, and determined from the beginning
|
|
5.
|
Chances for misunderstandings are minimized with the TEAM approach
|
|
6.
|
You get the best ideas from your TEAM members due to the cooperative TEAM spirit
|
|
7.
|
Realistic completion dates are established by the contractor who will do the work
|
|
|
|
|
How Fast Tracking Works
|
|
|
|